Short Answer

Lockheed Martin is likely to deliver at least 19 F-35 aircraft in Q1 2027, despite ongoing Lot 20+ contract negotiation funding shortfalls and identified supplier bottlenecks increasing the risk of deliveries near the 18-unit threshold, priced by the market at 91.0%.

1. Market Behavior & Drivers

This market's sharp re-rating in late October 2026 was driven by two distinct events. The initial 40-point spike on October 26 directly followed a Morgan Stanley upgrade of Lockheed Martin to Overweight, which cited a de-risking of the F-35 program. The price climbed another 20 points the next day, appearing to price in Lockheed's own October 22 announcements of a Q3 earnings beat and raised 2026 sales guidance.
Reports of a proposed 10-year production framework targeting 156 aircraft annually also coincided with the rally. This forward-looking guidance and analyst action seem to have completely overshadowed the program's recent performance. Lockheed had delivered only 94 F-35s in the first nine months of 2026, a significant drop from the 143 delivered over the same period in 2025. The market is pricing a recovery based on the new guidance and framework, not recent delivery actuals.
  • Above 18 deliveries are probable, despite Lot 20+ funding and supplier risks.
  • Deliveries above 34 units are possible, reflecting Lockheed's 43 F-35s in Q3 2026.

Who Wins and Why

Outcome Market Model Why
Above 18 91.0% 84.3% Q1 2027 F-35 deliveries face headwinds from ongoing funding shortfalls and identified supplier bottlenecks.
Above 34 65.0% 50.3% Q1 2027 F-35 deliveries face headwinds from ongoing funding shortfalls and identified supplier bottlenecks.
Above 36 61.0% 46.2% Q1 2027 F-35 deliveries face headwinds from ongoing funding shortfalls and identified supplier bottlenecks.
Above 30 0.0% 58.5% Q1 2027 F-35 deliveries face headwinds from ongoing funding shortfalls and identified supplier bottlenecks.
Above 32 0.0% 54.4% Q1 2027 F-35 deliveries face headwinds from ongoing funding shortfalls and identified supplier bottlenecks.

Current Context

Lockheed Martin's F-35 deliveries face challenges despite long-term targets. As of October 27, 2026, Lockheed Martin had delivered 94 F-35s in the first nine months of 2026, including 43 in Q3. This compares to 143 deliveries in the comparable 2025 period, which included 46 in Q3 2025 [1][2]. F-35 sales represented approximately 27% of Lockheed's consolidated sales in Q3 and the first nine months of 2026 [1][2]. Lockheed's latest disclosed operating plan targets 156 F-35 aircraft per year for 10 years, supported by an October 22, 2026 framework covering 850 U.S. aircraft [3][4]. However, Lot 20-and-higher production contracts remained under negotiation, and Lot 20 advance-acquisition costs exceeded current authorization and funding in Q3 2026 [3][1]. Management characterized the 156-aircraft rate as a stable long-term production plan, though the October 22 framework is not a finalized contract, providing capacity visibility more than a guaranteed quarterly delivery schedule [3][4][5]. The base-case prediction for Q1 2027 F-35 deliveries is approximately 40-44 aircraft, with a central estimate near 42 [3][1][6]. This forecast reflects moderate-to-low confidence, given 2026 delivery performance materially lagged the prior-year pace, and no official Q1 2027 guidance has been published [3][1][6]. Lockheed's latest FY2026 company guidance specifies approximately $80.0-$82.0 billion in sales, $30.35-$30.75 diluted EPS, $10.0-$10.2 billion operating cash flow, and $7.8-$8.0 billion free cash flow. Aeronautics Q3 sales were $8.214 billion, up 13% year over year, with $743 million operating profit and a 9.0% margin [1].
Market sentiment and contract progress influence near-term F-35 delivery outlook. The Kalshi market for "Lockheed Martin F-35 deliveries next quarter," settling April 22, 2027, indicates a 53% probability for more than 40 aircraft, 49% for more than 42, and 41% for more than 44 [6]. A separate Manifold market gives a 48% probability that Lockheed Martin will deliver more than 190 F-35s during calendar 2027; this is an annual threshold not directly applicable to a Q1 forecast [7]. Historical quarterly delivery cadence for F-35s is volatile; Lockheed delivered 47 F-35s in Q1 2025, but Q1-Q3 2026 totaled only 94, making a simple annual production rate division unreliable for quarterly forecasts [1][8]. Upside drivers for Q1 2027 deliveries include the resolution of Lot 20+ contracting and funding, alongside supply-chain execution and the long-term 156-aircraft framework [3][9][1]. Conversely, downside risks involve contract authorization delays, TR-3 technical issues, supplier constraints, and delivery timing concentrated in later quarters [3][9][1]. Estimated earnings dates are January 26, 2027 for Q4/FY2026 and April 20, 2027 for Q1 2027; these are unconfirmed estimates [10][11].
Sources (11)
  1. 1Documentsec.gov
  2. 2lmt-20260927sec.gov
  3. 3Lockheed Martin (LMT) Q3 2026 Earnings Call Transcript | The Motley Foolfool.com
  4. 4Lockheed lands Pentagon deal for 850 F-35 jets, lifts annual forecast By Reutersinvesting.com
  5. 5Lockheed Martin Raises 2026 Guidance, Unveils F-35 Production Plan With DOW – LMT Stock Set To Breach This Key Resistance After Nearly 2 Monthsfinance.yahoo.com
  6. 6Lockheed Martin F-35 deliveries next quarter Odds & Predictions 2027kalshi.com
  7. 7Will Lockheed Martin deliver more than 190 F-35 aircraft in 2027? | Manifoldmanifold.markets
  8. 8Lockheed Martin On Pace For Record F-35 Deliveries In 2025 - Defense Security Monitordsm.forecastinternational.com
  9. 9Lockheed Martin beats estimates, touts output agreement for F-35 (LMT:NYSE) | Seeking Alphaseekingalpha.com
  10. 10LOCKHEED MARTIN AKTIE AKTIE Termine | Quartalszahlen | Zwischenbericht | 894648finanzen.net
  11. 11Lockheed Martin (LMT.BOATS) Stock Price, Quote, News & Events - Stock Eventsstockevents.app

2. Price Chart

Historical Price (Probability)

Outcome probability
Date

3. Significant Price Movements

Notable price changes detected in the chart, along with research into what caused each movement.

📈 October 27, 2026: 20.0pp spike

Price increased from 71.0% to 91.0%

Outcome: Above 18

What happened: The primary driver of the price movement was Lockheed Martin's announcement of its Q3 2026 earnings, which beat expectations, and raised 2026 sales guidance on October 22, 2026 [1][2][3]. This coincided with reports around October 22-27, 2026, of a proposed 10-year F-35 production framework covering 850 U.S. aircraft, targeting 156 aircraft annually, and the company shifting next-lot award timing into 2027 [4][1][3][5][6]. These developments significantly increased confidence that F-35 delivery volumes for Q1 2027 would exceed 18 aircraft, given the implied quarterly rate of approximately 39 aircraft [4][1][3][5]. Social media was irrelevant, as no specific posts or viral narratives were substantiated as catalysts for this market move [7][4][8][1].

📈 October 26, 2026: 40.0pp spike

Price increased from 6.0% to 46.0%

Outcome: Above 18

What happened: The primary driver of the prediction market spike on October 26, 2026, appears to be traditional news and analyst action, not social media. Morgan Stanley upgraded Lockheed Martin to Overweight on that date, raising its price target by nearly 40% and explicitly citing the de-risking of the F-35 program following a new 10-year U.S. government framework for 850 F-35s [3]. This, combined with Lockheed's Q3 2026 earnings beat, significantly bolstered investor confidence in future F-35 deliveries [2]. Although the Royal Canadian Air Force announced Canada's first F-35 receipts on social media around October 25-26, this activity was mostly noise and does not appear to have driven the market movement [9].
Sources (9)
  1. 1Lockheed Martin will surge nearly 40% after new Pentagon deal, says Morgan Stanleycnbc.com
  2. 2Lockheed Martin Reports Third Quarter 2026 Financial Results | Lockheed Martin Corpinvestors.lockheedmartin.com
  3. 3Lockheed lands Pentagon deal for 850 F-35 jets, lifts annual forecast By Reutersinvesting.com
  4. 4GMT EIGHT - Latest - Lockheed Martin Receives Major Order from the U.S. Department of Wargmteight.com
  5. 5Lockheed Martin (LMT) Q3 2026 Earnings Call Transcript | The Motley Foolfool.com
  6. 6Third Quarter 2026 Earnings Conference Callinvestors.lockheedmartin.com
  7. 7Lockheed Martin (NYSE:LMT) Stock Jumps 5.2% Following Analyst Upgrade - Defense Worlddefenseworld.net
  8. 8GMT EIGHT - Latest - U.S. Stocks in Motion | Lockheed Martin (LMT.US) Rises Over 6% as Q3 Revenue Grows 11% Year-over-Year and Full-Year Guidance Is Raisedgmteight.com
  9. 9Canada receives its first F-35 jets from U.S.bnnbloomberg.ca

4. Market Data

Contract Snapshot

This market resolves "YES" if Lockheed Martin's F-35 deliveries for the next quarter are above the specific numerical threshold of the purchased contract (e.g., above 40 deliveries). It resolves "NO" if deliveries are at or below that threshold. Trading for this market concludes on April 22, 4:00 PM EDT, with a maximum payout date of August 20, 2027.

Available Contracts

Market options and current pricing

Outcome bucket Yes (price) No (price) Last trade probability
Above 18 $0.91 $0.10 91%
Above 34 $0.66 $0.35 65%
Above 36 $0.62 $0.39 61%
Above 30 $0.74 $0.27 0%
Above 32 $0.69 $0.32 0%
Above 38 $0.57 $0.44 0%
Above 40 $0.50 $0.51 0%
Above 42 $0.42 $0.59 0%
Above 44 $0.33 $0.68 0%
Above 46 $0.26 $0.75 0%
Above 58 $0.05 $0.96 0%

Market Discussion

Prediction markets currently price Lockheed Martin F-35 deliveries in Q1 2027 around 40–42 aircraft, implying meaningful uncertainty near the low-40s threshold [1][2]. This estimate compares to a Q1 2026 baseline of 47 deliveries [3] and is below the implied quarterly average of Lockheed's stated goal to sustain approximately 156 F-35 aircraft annually, although it aligns with a typical ramp-and-timing profile for deliveries [4][5][6][7][8]. While sell-side analysts are constructive and social media sentiment is broadly bullish on Lockheed, some discussion flags a production slip or lower 2027 guidance as a potential downside catalyst [9][10][11].

Sources (11)
  1. 1Lockheed Martin F-35 deliveries in Q1 2027 - Predictionscoinbase.com
  2. 2Lockheed Martin F-35 deliveries next quarter Odds & Predictions 2027kalshi.com
  3. 3Lockheed Martin Reports First Quarter 2026 Financial Results | Lockheed Martin Corpinvestors.lockheedmartin.com
  4. 4Third Quarter 2026 Earnings Conference Callinvestors.lockheedmartin.com
  5. 5Lockheed lands Pentagon deal for 850 F-35 jets, lifts annual forecast By Reutersinvesting.com
  6. 6F-35 Production Holds at 156 Jets a Year | AeroCorneraerocorner.com
  7. 7U.S. Keeps F-35 Fighter Jet Production at 156 Aircraft as Global Demand Stays Strongarmyrecognition.com
  8. 8Lockheed Martin Rockets Higher on a Beat-and-Raise Quarter. Here's Our Price Target for 2027 - 24/7 Wall St.247wallst.com
  9. 9Bernstein Raises Its Target on Lockheed Martin | MarketScreener Australiaau.marketscreener.com
  10. 10UBS Elevates Lockheed Martin to Buy, Citing Sustained Missile Demand and F-35 Servicestradevae.com
  11. 11$LMT · Lockheed Martin Corporation — TickerTalkstickertalks.ai

5. Trust Index

Octagon Trust Index Kalshi 61 Caution

Company-reported metric: finance and investor relations know the number before the earnings release

Integrity risk· Information exposure

How it adds up
Integrity80% of score60Caution
Trade quality20% of score66Caution

Includes the cost to trade: a $10,000 order can't be filled here because the order book is too thin.

Trust score61Caution

Weighted blend with hard caps — a critically weak safety pillar, or a severe trading anomaly, caps the total regardless of the rest. Full methodology · About the Trust Index

Trust profile
Integrity4 screens run · 3 don't apply · 3 awaiting data

6. What are the key milestones for Lockheed Martin's F-35 Lot 20+ contract negotiations, and how could their timing impact Q1 2027 deliveries?

Lot 20+ Negotiations StatusRemained open as of Lockheed Martin's October 22, 2026 Q3 filing [1][2]
Long-Lead Materials Contract$700 million for F-35 Lots 20 and 21 international partners in Q1 2026 [3][4]
FY2027 Lot 21 US Aircraft85 aircraft identified in acquisition plan [5][6]
Securing supplemental Lot 20 authorization and funding is crucial for Lockheed Martin to support F-35 deliveries in Q1 2027. As of the company's Q3 2026 filing on October 22, 2026, negotiations with the U.S. Government for F-35 production Lots 20 and higher remained open [1][2]. Costs incurred on the Lot 20 advance-acquisition contract had exceeded currently authorized and funded amounts during Q3 2026, which highlights a risk to future financial performance without additional authorization and funding [1][2]. Unresolved funding poses a risk of production pauses, delayed deliveries, and cash-flow pressure [1][7].
Despite some progress, full production contracts for future lots require further authorization. Lockheed Martin secured a $700 million contract for long-lead materials for F-35 Lots 20 and 21 for international partners in Q1 2026 [3][4]. Additionally, an October 2026 announcement detailed a 10-year framework for Lots 21-30; however, this framework is not a production contract [8][7][3][4]. It still requires congressional multiyear-procurement authority, funding, and subsequent contract finalization [8][7].
Timely Lot 20 funding is crucial for avoiding Q1 2027 delivery constraints. Prompt Lot 20 funding before or early in Q1 2027 would reduce risk to deliveries [1][7]. Conversely, a late contract signature would likely offer limited immediate benefit due to the extensive lead times required for aircraft parts, assembly, and testing [1][7]. The ongoing Lot 20 negotiations are therefore more likely to constrain rather than boost Q1 2027 F-35 deliveries [1][7].
Sources (8)
  1. 1Form 8-K for Lockheed Martin Corp filed 10/22/2026investors.lockheedmartin.com
  2. 2Form 10-Q for Lockheed Martin Corp filed 10/22/2026investors.lockheedmartin.com
  3. 3Lockheed Martin (LMT) Q1 2026 Earnings Transcriptfool.com
  4. 4F-35 ADVANCED AQUISITION LOT 20 Contract N00019-25-C-0070 Originallockheedmartin.com
  5. 5Modernized Selected Acquisition Report (MSAR) F-35...esd.whs.mil
  6. 6Pentagon, Lockheed Agree on 10-Year Framework for F-35airandspaceforces.com
  7. 7Pentagon, Lockheed unveil 10-year F-35 plan for 850 US jetsaerotime.aero
  8. 8EXCLUSIVE: Pentagon, Lockheed weigh multi-year F-35...breakingdefense.com

7. How does Lockheed Martin's historical quarterly F-35 delivery cadence from 2024-2026 inform the feasibility of delivering over 40 aircraft in Q1 2027?

Lockheed Martin's stated quarterly production benchmarkApproximately 39 aircraft [1][2][3]
Highest recent quarterly deliveries (Q3 2024)48 aircraft [4][5]
Lowest recent quarterly deliveries (Q1 2026)32 aircraft [6][3]
Delivering over 40 F-35s in Q1 2027 is possible but uncertain. Delivering over 40 F-35 aircraft in the first quarter of 2027 is considered feasible, though this level is not strongly supported by the most recent delivery cadence from 2024-2026, as it would necessitate a modest recovery from the depressed run rate observed in 2026 [7][8][5][4][6][3]. While such a level would align with the handover rates seen in 2025 and late 2024, the unresolved challenges related to TR-3 and acceptance constraints make the outcome uncertain, resembling a coin flip rather than a highly confident base case [7][8][5][4][6][3]. Lockheed Martin's stated production benchmark aims for 156 aircraft annually, which is roughly 39 per quarter, yet actual customer handovers have shown significant fluctuations [1][2][3].
F-35 deliveries showed volatility, including a significant 2026 slowdown. For instance, Q1-Q2 2024 recorded zero F-35 deliveries due to TR-3 transition and acceptance issues, with deliveries resuming only on July 19, 2024, bringing Q3 2024 deliveries to 48 aircraft [4][5][1][9][3]. In contrast, H1 2025 saw 97 aircraft delivered, including 47 in Q1 and 50 in Q2, with Q3 2025 adding 46 [8]. However, 2026 experienced a slowdown, with H1 2026 delivering only 51 aircraft (32 in Q1 and 19 in Q2) and Q3 2026 adding 43, resulting in 94 deliveries for the first nine months, a decrease from 143 in the comparable 2025 period [6][3]. This 2026 slowdown was attributed to TR-3 integration, parts shortages, readiness challenges, and fewer aircraft requested in the Pentagon's FY2026 budget [9][10].
Achieving over 40 deliveries in Q1 2027 would surpass recent 2026 rates. A delivery count exceeding 40 in Q1 2027 would surpass the 2026 average quarterly pace through Q3 (31.3) and Q1 2026's 32, but it would still be below the levels of Q1-Q2 2025 (47 and 50) and Q3 2024 (48) [6][3]. The prediction market, as of October 26, 2026, indicated a 52.5% probability for over 34 Q1 2027 deliveries and a 50% probability for over 46, suggesting near even odds for this range [11]. As of October 27, 2026, an official Lockheed-reported Q4 2026 delivery count was not available, nor was a Q1 2027 company forecast, meaning the assessment for 2027 cannot factor in any confirmed recovery or deterioration from the end of 2026 [12][9][3].
Sources (12)
  1. 1LOCKHEED MARTIN CORP Form 8-K filed July 19, 2024sec.gov
  2. 2LOCKHEED MARTIN CORP Form 8-K filed September 6, 2023sec.gov
  3. 3How Many F-35s Have Been Built? The 2026 Count | AeroCorneraerocorner.com
  4. 4Documentsec.gov
  5. 5Documentsec.gov
  6. 6Lockheed Martin delivers 43 F-35 Lightning II fighters in Q3...defence-industry.eu
  7. 7Fourth Quarter 2024 Recap | Lockheed Martinlockheedmartin.com
  8. 8Documentsec.gov
  9. 9FY 2025 Annual Reportdote.osd.mil
  10. 10Earnings call transcript: Lockheed Martin misses Q1 2026...investing.com
  11. 11Tech Prediction Markets & Odds - Page 24 | PredictPediapredictpedia.com
  12. 12Form 10-Q for Lockheed Martin Corp filed 10/22/2026investors.lockheedmartin.com

8. How do Lockheed Martin's stated F-35 production goals for 2027 compare to the targets for other major fighter programs, such as Boeing's F-15EX?

Lockheed Martin F-35 2027 Annual Production GoalApproximately 156 aircraft [1][2][3]
Boeing F-15EX 2027 Official Production TargetNot available [1][4]
F-35 Aircraft Delivered in 2025191 aircraft [5]
Lockheed Martin aims for substantial F-35 production in 2027. The company's stated F-35 production goal for 2027 is set around an annual framework of approximately 156 aircraft [1]. This aligns with an October 2026 framework contemplating 850 U.S. F-35s over ten years and maintaining annual production at approximately 156 aircraft, though this was not yet a finalized contract [2][3]. In 2025, the F-35 program demonstrated strong performance, delivering a record 191 aircraft, outpacing any other allied fighter then in production by five times [5]. For the first quarter of 2027, a prediction market snapshot from October 26, 2026, priced a 52.5% chance of exceeding 34 aircraft and a 50% chance of exceeding 46 aircraft for Lockheed Martin F-35 deliveries [1].
Boeing's official F-15EX 2027 production targets are not publicly available. A precise comparison with Boeing's F-15EX 2027 production targets is not possible, as official figures from Boeing for that year are not provided in the available research [1][4]. While a 2026 force-planning discussion suggested a requirement for 36 additional F-15EXs annually to reach 1,558 fighters by 2035, this represents a planning requirement for the F-15EX, not a Boeing-confirmed 2027 production target [4]. Consequently, this 36-aircraft-per-year planning quantity is not established as Boeing's official 2027 target and should not be treated as equivalent guidance to Lockheed Martin's ambition of a very high-volume, approximately 156-aircraft annual production pace for the F-35 [1][2][5][3].
Sources (5)
  1. 1Tech Prediction Markets & Odds - Page 24 | PredictPediapredictpedia.com
  2. 2Modernized Selected Acquisition Report (MSAR) F-35...esd.whs.mil
  3. 3Lockheed's Higher 2026 Guidance, F-35 Production Plan...stocktwits.com
  4. 4How Many F-35s Does The US Air Force Fly In 2026?simpleflying.com
  5. 5F-35 Breaks Delivery Record, Continues Combat Success...news.lockheedmartin.com

9. What public data from key F-35 suppliers like Northrop Grumman and BAE Systems can indicate potential production bottlenecks ahead of Q1 2027?

Northrop Grumman Primary BottleneckF-35 radar development and supplier constraints [1][2][3]
BAE Systems Contract AnnouncementOctober 6, 2026, for F-35 Lots 20-22 plus retrofit/modernization systems [4]
BAE Systems Key DependencyRobust supply chain scaling [5][4]
Northrop Grumman's radar and supplier issues pose Q1 2027 F-35 risks. Potential production bottlenecks impacting F-35 deliveries by Q1 2027 largely originate from Northrop Grumman's radar development and broader supplier constraints [1][2][3]. Northrop Grumman's disclosures in Q1 2026 detailed risks stemming from supplier viability, labor shortages, raw-material and component availability, supply-chain disruption, and extended lead times [1][3]. Management has specifically identified the F-35 radar as a critical bottleneck, noting concurrent development-and-production challenges and plans to accelerate radar capacity while assisting sub-tier suppliers [2][3].
BAE Systems' supply chain readiness is vital for F-35 production. BAE Systems, having secured work from Lockheed Martin for F-35 Lots 20–22 and retrofit/modernization systems on October 6, 2026, also relies heavily on a robust supply chain to support its production throughput, despite investments in automation and facilities [4]. This explicit dependence makes supplier readiness a key watch item for potential Q1 2027 bottlenecks [5][4]. To monitor these risks, key leading indicators include Northrop's radar output and its test and qualification milestones, BAE's throughput for rear-fuselage/empennage and AN/ASQ-239 electronic warfare units, and general supplier metrics such as lead times, shortages, expedite costs, and inventory levels [1][3][4][6].
Sources (6)
  1. 1earnings releasesec.gov
  2. 2Northrop Grumman reaffirms $43.5B-$44B 2026 sales...seekingalpha.com
  3. 3Northrop Grumman Corporation Q1 2026 Earnings Call...finance.yahoo.com
  4. 4BAE Systems to deliver electronic warfare systems for F-35...prnewswire.com
  5. 5HY 2026 - Half Yearly Reportinvestors.baesystems.com
  6. 6F-35 Breaks Delivery Record, Continues Combat Success...news.lockheedmartin.com

10. What is the projected resolution timeline for the F-35's Technology Refresh 3 (TR-3) software integration, and how might delays affect the Q1 2027 delivery count?

TR-3 Software Completionachieved (as of Jan 2026/FY2027 MSAR) [1][2]
Estimated Q1 2027 Deliveriesroughly 35-45 aircraft [1]
Combat-Capable TR-3 Delivery to U.S. Forcesnot until September 2025 [3]
The F-35's Technology Refresh 3 (TR-3) software integration has achieved significant milestones, though its practical resolution timeline extends. As of the FY2027 Modernized Selected Acquisition Report (MSAR) and Lockheed Martin's January 2026 program update, TR-3 hardware is being delivered, and the program states TR-3 software completion was achieved [1][2]. Full TR-3/Block 4 capability is not expected earlier than 2026 [4]. While truncated software enabled earlier deliveries, combat-capable TR-3 aircraft were not delivered to U.S. forces until September 2025 [3]. Incremental software releases, which follow initial completion, can take approximately two to six weeks per release [5].
Prior TR-3 testing delays caused a roughly yearlong pause in F-35 deliveries, creating a backlog of 30 aircraft. Even after airframe production, additional defects could push acceptance into later quarters, affecting delivery schedules [6][5]. In calendar year 2025, 191 F-35s were delivered, which notably included aircraft previously deferred due to the lack of TR-3 capability [2]. This highlights how TR-3 integration challenges can significantly impact delivery numbers by delaying previously completed airframes.
Looking ahead to Q1 2027, delivery projections remain uncertain due to the potential for further software or certification delays. A reasonable scenario assessment indicates that renewed delays could result in deliveries below 34, while conversely, clearing the existing deferred inventory could push the quarter's total above 46. The October 26, 2026 snapshot for the Q1 2027 prediction market priced above 34 deliveries at 52.5% and above 46 at 50%, implying a market-centered range around the mid-30s to mid-40s [1][7].
Sources (7)
  1. 1Modernized Selected Acquisition Report (MSAR) F-35...esd.whs.mil
  2. 2F-35 Breaks Delivery Record, Continues Combat Success...news.lockheedmartin.com
  3. 3DOT&E Says No Combat-Capable TR-3-Configured F-35s...theaviationist.com
  4. 4Lockheed Martin F-35 Lightning II fighter pogramme in crisisdefence-industry.eu
  5. 5Even After F-35's TR-3 Software is Approved, Frequent...airandspaceforces.com
  6. 6F-35 Lightning IIairandspaceforces.com
  7. 7Tech Prediction Markets & Odds - Page 24 | PredictPediapredictpedia.com

11. What Could Change the Odds

Key Catalysts

Lockheed Martin delivered 43 F-35 aircraft in Q3 2026, contributing to a total of 94 aircraft for the first nine months of 2026 [1][2][3]. In October 2026, Lockheed Martin and the Pentagon announced a 10-year framework agreement targeting production of 156 F-35s per year, contingent on congressional multi-year procurement authority [4][5][6].
The company is in ongoing negotiations for F-35 Lots 20 and higher [3][5]. Lockheed Martin warned that results and cash flow could be negatively impacted in future periods without additional contractual authorization and funding [3][5]. Despite this, Lockheed Martin projects high single-digit revenue growth for 2027, expecting all four business segments to grow on a top-line basis, bolstered by a strong backlog and demand [5].
Prediction markets for Q1 2027 F-35 deliveries indicate uncertainty [7]. Implied probabilities for deliveries exceeding 40 units hover near 53% [7].

Key Dates & Catalysts

  • Expiration: August 20, 2027
  • Closes: August 20, 2027
Sources (7)
  1. 1Lockheed Martin’s Record $292 Billion Backlog Comes With a Delivery Test | Investing.cominvesting.com
  2. 2Lockheed Martin beats estimates, touts output agreement for F-35 (LMT:NYSE) | Seeking Alphaseekingalpha.com
  3. 3Lockheed Martin Reports Third Quarter 2026 Financial Results | Lockheed Martin Corpinvestors.lockheedmartin.com
  4. 4Lockheed lands Pentagon deal for 850 F-35 jets, lifts annual forecast By Reutersinvesting.com
  5. 5Lockheed Martin (LMT) Q3 2026 Earnings Call Transcript | The Motley Foolfool.com
  6. 6Pentagon, Lockheed Agree on 10-Year Framework for F-35airandspaceforces.com
  7. 7Lockheed Martin F-35 deliveries next quarter Odds & Predictions 2027kalshi.com

13. Historical Resolutions

Historical Resolutions: 9 markets in this series

Outcomes: 5 resolved YES, 4 resolved NO

Recent resolutions:

  • KXLMT-26OCTF35-60: NO (Oct 22, 2026)
  • KXLMT-26OCTF35-55: NO (Oct 22, 2026)
  • KXLMT-26OCTF35-50: NO (Oct 22, 2026)
  • KXLMT-26OCTF35-45: NO (Oct 22, 2026)
  • KXLMT-26OCTF35-40: YES (Oct 22, 2026)